Flowserve MX FOUNDATION Fieldbus Field Unit Manual de usuario Pagina 16

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 84
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 15
MX/QX FOUNDATION Fieldbus Field Unit FCD LMENIM2330-01 – 08/11
16
Figure 2.6 – Fieldbus Power Supply with External Termination
Figure 2.7 – Fieldbus Power Supply with MX/QX FF Termination
2.6 Site and Network Cable Preparation
2.6.1 Site Preparation
Prepare the site and associated equipment for operation of the MX/QX FF controlled MX/QX actuators
as follows:
1. Prepare a detailed site plan consisting of the following:
Actuator locations and tag numbers
Junction boxes and terminal strip locations and tag numbers
Terminators and power supplies/conditioners, and repeaters
Provide free access to the MX/QX control panel and terminal block for setup, configuration,
and troubleshooting.
T
FOUNDATION
Fieldbus
Interface
+
-
Fieldbus
Power
Supply
Shielded Wire Pair
T
Field
Device
Field
Device
Field
Device
T
FOUNDATION
Fieldbus
Interface
+
-
Fieldbus
Power
Supply
Shielded Wire Pair
Field Device
Field
Device
Field
Device
T
Vista de pagina 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 83 84

Comentarios a estos manuales

Sin comentarios