
1.0 Physical Description and Operation of Equipment
2.0 Design Conditions
3.0 Operating Conditions
4.0 Test Conditions
5.0 Operating Precautions and Limitations
6.0 Installation Instructions
7.0 Maintenance Requirements
2
800-lb. Split-Wedge Gate Valves FCD ADENIM0002-00
8.0 Periodic In-Service Testing Recommendations
and Procedures
9.0
Maintenance Instructions
10.0 Storage Requirements
11.0 Bolting Torque Values
12.0 Reference Drawings
13.0 Customer-Certified Assembly Drawing(s)
Table of Contents
Comentarios a estos manuales