
11
Installation – continued –
Steam trap with socket-weld ends
1. Observe position of installation.
2. Observe flow direction. The flow direction arrow is located on the valve body.
3. Leave at least
40 mm free space around the equipment for subsequent disassembly of the
cover E.
4. Remove plastic plugs. They are
only used for transit protection.
5. Remove regulator as described in section
Maintenance.
6. Clean socket-weld ends.
7. Apply
only electric arc welding process (welding process 111 and 141 in accordance with
ISO 4063).
Steam trap with butt-weld ends
1. Observe position of installation.
2. Observe flow direction. The flow direction arrow is located on the valve body.
3. Leave at least
40 mm free space around the equipment for subsequent disassembly of the
cover E.
4. Remove plastic plugs. They are
only used for transit protection.
5. Remove regulator as described in section
Maintenance.
6. Clean butt-weld ends.
7. Apply electric arc welding process (welding process 111 and 141 in accordance with
ISO 4063) or gas welding (welding process 3 in accordance to ISO 4063).
Attention
■ Only qualified welders certified e. g. according to EN 287-1 may weld the valve into
pressurized lines.
■ The valve must not be insulated.
Heat treatment of welds
A subsequent heat treatment of the welds is not required.
Comentarios a estos manuales