
11
Installation
– continued –
Mounting electrode
– continued –
Observe TÜV (German Technical Supervisory Association) regulations when using the level
electrode in steam boilers or (pressurised) hot water plants.
■
For the approval of the boiler standpipe the relevant local and national regulations must
be observed.
■
Several examples of installation are given on page 12.
■
The angle of installation of the electrode must not exceed 45° and the length of the elec-
trode rod is limited to 500mm!
■
If installed outdoors the level electrode
must
be equipped with a GESTRA weather pro-
tection cover.
Tools
■
Open-end spanner 22mm A. F.
■
Bolt cutter or metal cutting saw
■
Flat file, medium cut
Note
Comentarios a estos manuales