ShearStream SB FCD VLENIM4152-01 07.09
List of materials and spare parts 7
Ordering of spare parts 8
To remove the valve from the pipework 9.1
To inspect the ball sector and seat ring 9.2
To inspect and replace the upper shaft
seal of Safeguard type 9.3
To inspect and replace the upper shaft
seal of ZebraCL™ type 9.4
To change the gasket at the lower stem 9.5
Fitting the actuator to the valve 10
The instructions and list of spare parts are applicable to
ShearStream SB ball sector valves in accordance with
catalogue sheet FCD NFEETB4152-01.
All lifting must be carried out on the valve itself and not
on the actuator. The joint between the valve and the actua-
tor is designed for carrying the operating torque and the
weight of the actuator - see Fig. 1.
Fig.1 Lifting of the valve
All valves leaving our plant are inspected and tested in
accordance with the relevant requirements or in accor-
dance with the requirements specifi ed by the purchaser.
Valves equipped with actuators are subject to functional
testing and are adjusted in such a manner that every unit
is completely ready for direct installation in the pipework.
However, in view of damage that may have occurred
during transport, it is advisable that receiving inspection
We would suggest the following inspection procedure:
the valve delivered is correct in
terms of type, size, equipment
- Examine the valve, actuator and valve positioner
regarding possible damages