Flowserve URB 2 Manual de usuario Pagina 12

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 48
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 11
12
Wiring – continued –
Wiring diagram for CAN bus system – example –
Attention
Wire equipment in series. Star-type wiring is not permitted!
Connect screens of the bus cables once to the central earthing point (CEP).
If two or more system components are connected in a CAN bus system, the first and
the last device must be provided with a terminating resistor of 120 Ω (terminal
C
L
/C
H
). We recommend that you use the URB 2 with a connecting socket equipped with
terminating resistor either as first or as last device.
Only one operating and display unit URB 2 may be used per CAN bus network.
The CAN bus system must not be interrupted during operation.
In the event of an interruption a malfunction alarm is raised.
The operating and display unit URB 2 must not be applied in parallel with the operating,
display & automatic control device SPECTORcontrol.
Basic Settings
Factory setting
Operating & display unit URB 2
The operating and display unit URB 2 unit features the following factory set default values:
Node ID: 60
Baud rate: 250 kBit/s (125 m cable length)
Fig. 6
Connecting socket with
terminating resistor 120 Ω
Plug with terminating
resistor 120 Ω
Central
earthing point
CEP
Control unit
NRS 1-4x
NRS 2-40
NRR 2-40
LRR 1-40
TRS 5-40
Operating device
URB 2
Level electrode
Conductivity
electrode
NRG x6-4x
LRG xx-4x
Temperature
transmitter
TRV 5-40
Vista de pagina 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 47 48

Comentarios a estos manuales

Sin comentarios