Flowserve CPM Series Manual de usuario Pagina 8

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 7
8
Inlet Outlet
Clockwise (CW) Port c Port b
Counterclockwise (CCW) Port b Port c
Shaft rotation from exposed end of gland Figure 7
3 Piping
3.1 Taps b and c in the gland are barrier uid inlet and outlet
ports. Use Figure 7 to determine which ports to use as inlet and
outlet.
C
C
W
Rotatio
n
CW
Rotation
b
c
3.2 For dual seal pressurized seal operation, supply a clean
compatible barrier uid to the inlet port at a pressure at least 25
psi (170 kPa) above the stufng box pressure. See Figure 8.
Flowserve can supply information on barrier uid ow
requirements based on seal size, product temperature, barrier
uid characteristics, and shaft speed. For assistance, contact
your nearest Flowserve Sales and Service Representative or
Authorized Distributor.
Vista de pagina 7
1 2 3 4 5 6 7 8 9 10 11 12

Comentarios a estos manuales

Sin comentarios