Flowserve PSS III Durametallic Manual de usuario Pagina 10

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 9
10
8 Gland Gasket Installation
8.1 Assembletheglandhalves.
Tighten the cap screws until the
gland joints are metal to metal.
8.2 Wipetheglandgasketgroove
clean with alcohol.
Caution: Consult material safety data
sheets for proper handling of
alcohol.
8.3 Usingapaperclipapplyadot
ofadhesiveintheglandgasket
groove about 6.3mm(.25 inch)
from each side of the split joints,
4 dots total. Then apply dots of
adhesiveintheglandgasket
groove, space about 12.7to
25.4 mm (0.50 to 1 inch)apart.
Do not apply adhesive closer than
6.3mm(0.25 inch)tothesplit
joint.SeeFigure18.
8.4 Centertheglandgasketinthe
gasketgrooveandholditinplace
with hand pressure for 10 seconds
until the adhesive sets. On larger
sizesuseaatplatetoensure
rmequalpressurearoundthe
entire circumference.
SeeFigure19.
8.5 Withthebladeata20°to30°
angle from the vertical cut the
gasket3.0to3.8mm(0.12 to
0.15 inch)fromtheonesplitjoint.
Repeatontheoppositeside,180°
fromtherstcut.
See Figure 20 and 21.
Figure18
Figure19
Figure 20
3.18 - 3.81 mm
(0.125 - 0.150 inch)
Vista de pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 16

Comentarios a estos manuales

Sin comentarios