Flowserve NRS1-40.1 Manual de usuario Pagina 16

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 34
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 15
16
Wiring
– continued –
Wiring diagram for CAN bus system - example -
– continued
Connect screen only to the respective terminals and to the central earthing point (CEP).
The rated voltage is indicated on the name plate.
When switching off inductive loads, voltage spikes are produced that may impair the op-
eration of control and measuring systems. Connected contactors must therefore be pro-
vided with suppressors such as RC combinations.
In the event of an alarm the signal output (terminal 7 and 8) is instantaneously closed.
In the event of a malfunction the signal output (terminals 7 and 8) is opened and closed
in a clock-pulse controlled way in order to ensure an optical differentiation between an
alarm and a malfunction signal. If required you can wire terminals 7 and 8 with an exter-
nal signal lamp.
Tools
Screwdriver for slotted screws, size 2.5, completely insulated according to VDE 0680-1
Screwdriver for cross head screws, size 2
Basic Settings
Factory settings
Control unit NRS 1-40.1
The control unit features the following factory set default values:
Node ID: 1
Baud rate: 250 kBit/s (125 m cable length)
De-energizing delay: 3 sec.
Configuration: Operation with two level electrodes NRG 1x-40, one level electrode NRG 1x-41.1 and
one temperature transmitter TRV 5-40.
Note
Vista de pagina 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 33 34

Comentarios a estos manuales

Sin comentarios