4 Operation
FollowingtheserecommendationswillensuremaximumMTBPMofthe
P-200 seal.
4.1 Do not exceed corrosion limits. The P-200 is designed to resist
corrosionbymostchemicals.However,donotexposetheP-200
materials of construction to products outside of their corrosion lim-
its. The P-200 assembly drawing lists the materials of construction.
For chemical resistance ratings, consult Flowserve.
4.2 Do not exceed the pressure-velocity (P-V) limits.
4.3 Do not exceed the temperature limits of the P-200. The materi-
als of construction are listed on the assembly drawing. For the
temperature limits of materials, consult Flowserve. Turn on any
coolingwatertothesupplytankbeforestart-up.
4.4 Do not start up or run the P-200 dry.Buffer/barrieruidmustbe
in the seal cavity at all times during pump operation.
For special problems encountered during installation, contact your
nearestFlowserveSalesandServiceRepresentativeorAuthorized
Distributor.