
6
2.3 Position the P-200 cartridge gland withtheglandgasketinplace
againstthepumpbackplate(sealchamber/stufngbox)face,
installatwashersonthestudstopreventmisalignment,and
tighten the gland nuts evenly, cross-staggering the adjustment
ofthenuts.Donotovertighten.
2.4 Assemble the pump, adjust the bearings, set the impeller
and connect the coupling so that the shaft is in its operating
axialposition.Anysubsequentaxialadjustmentoftheshaft
requiresresettingoftheseal.Connectpumppiping,
(seeSection3)allowingnopipestrainonthepumpcasing.
2.5 Tighten the set screws ontheP-200cartridgecollarwiththeAllen
wrench provided.
2.6 Remove setting devices by removing the cap screws with the
Allenwrenchprovided.Savethesettingdevicesforuseifpump
impeller must be reset or if the P-200 is removed for maintenance.
2.7 Turn the shaft by hand to ensure free operation.
2.8 Pipe up the gland connectionstotheP-200sealasexplainedin
Section3.
2.9 See Operational Recommendations,Section4,beforestarting
pump.
3 Piping
3.1 Install an ANSI 7311 ush for horizontal pumps or ANSI 7313
for vertical pumps. from the pump discharge to the P-200 seal
ushport,aFigure4.Tomaximizeseallife,Flowserverecom-
mendsaproductbypassushbeusedwheneverpossiblewitha
P-200sealinstalledinconventionalstufngbox.Abypassushis
not necessary when an enlarged tapered or cylindrical seal cham-
berisused.Ifabypassushisnotused,plugtheushporta .
Comentarios a estos manuales